Jump to content
tanknet.org

Recommended Posts

As I said..just prototype. :)

 

But it's not. The use of the word "prototype" implies that there's a program and a budget behind it and that the basic construction design has been finished. None of that is true. A "Leopard 3", should it ever be named like that, is still at least fifteen years away.

 

This is the Rheinmetall/IBD Deisenroth modernization of the Leopard 2 that Singapore bought. They will put in their own fire control system, and that's about it.

Link to post
Share on other sites

 

It's the Leopard 2 Revolution...

 

No, this is clearly the M113 Super Gavin fitted with a 140 mm lightweight turret.

 

Pah.

"The enemy won't flinch -

unless it's sixteen inch" :D

Link to post
Share on other sites

 

As I said..just prototype. :)

 

But it's not. The use of the word "prototype" implies that there's a program and a budget behind it and that the basic construction design has been finished. None of that is true. A "Leopard 3", should it ever be named like that, is still at least fifteen years away.

 

This is the Rheinmetall/IBD Deisenroth modernization of the Leopard 2 that Singapore bought. They will put in their own fire control system, and that's about it.

 

 

OK, I stand corrected. Still interesting concept.

Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...